2019 JULY UNITED PETROLEUM TINTINARA SA

Tank Lining

Scope – UL1856 Tank Lining to single wall steel 25KL

Clock work timing with highly efficient and safe cooperative work between PTT staff, Tim and Dave from ECL and permit writer Brian Starling from Acella Pty Ltd. Tank lined and cathodic protection installed in stormy, wet and miserable conditions but all involved remained incredibly up beat and positive throughout. Thanks to Tim, Dave and Brian for being patient and positive in the rain.

  • CATEGORY
  • TAGS